1. Melting section

  • Inductotherm induction furnace with two 2200Kg (gross) tanks.
  • Inductotherm induction oven with one 600Kg (gross) tank.
  • 7 ladles of 1800Kg.
  • 1 Ladle of 2500Kg.
  • 3 Ladles of 600Kg.

2. Treatment furnaces section

  • Coel electric treatment furnace with 2680 x 1800 bed (maxT: 1100ºC).
  • Insertec electric treatment furnace 3200 x 1730 (maxT 1100ºC).

3. Casting lines

  • COREMAKING SECTION:
    • Loramendi Blow Moulding Machine 16L.
    • Loramendi Blow Moulding Machine 12L.
    • Ondarlan continuous mixer.
    • GREEN SAND MOULDING SECTION:
      • 2 x CT-5 Machines.
      • Eirich Mill.
      • Green sand regeneration processor.
      • Automatic demoulders.
      • SAND CASTING SECTION:


        • IMF sand casting installation, consisting of mixer, tumbler, manipulator, carousel, demoulder.
        • MANUAL SECTION:
          • Continuous hand mixer with vibrating table.
          • Manual part demoulder.

        instalaciones2

        4. Cutting and cleaning section

        • Alju 4 turbine shot blaster with dimensions of 2.7m x 1.7m.
        • Cutting carousel adapted to blowtorch and air arc cutter.

        5. Welding section

        • 2 welding booths adapted for electrode and thread.
        • Aspiration adapted for correct work.

        6. Deburring section

        • Two deburring cabins adapted for the use of all types of grinders and Rotaflex.